Highlights
•First formal environmental risk assessment for pharmaceutical excipients.
•Based on material balances of single galenical productions at two sites.
•PEC/PNEC risk ratios for wastewater treatment plants and the receiving water.
•No risk identified for wastewater treatment or receiving water (River Rhine).